Moving BCYF to the Taft Building during construction

September 2026 survey · 472 responses · rated from 1 (least favorable) to 5 (most favorable)

4.01mean rating out of 5
70.6%rated it 4 or 5
8.1%rated it 1 or 2

The City proposes the Taft Building as a temporary location for BCYF programming while the new community center is built. The Taft has a gym, an auditorium/cafeteria and 36 parking spaces, and sits across from Brighton High School.

5%
3%
21%
27%
43%
1
2
3
4
5
1 — least favorable5 — most favorable

Source: City of Boston Jackson Mann site survey, September 2026. Graphic made with assistance from Claude AI.