How Allston-Brighton rated the two Jackson Mann proposals

September 2026 survey · 473 responses · each proposal rated from 1 (least favorable) to 5 (most favorable)

1 — least favorable23 — neutral45 — most favorable
Proposal A: Community Center + Maximum HousingCommunity Center with a pool, design from 2027/28. No new school. Maximise affordable or mixed-income housing.
mean 3.78
Proposal B: Community Center + Housing + BPS SchoolHold part of the site for a possible future school. Community Center with a pool, design from about 2029. Less housing.
mean 2.56
60%40%20%0%20%40%60%80%

Bars are centered on the neutral midpoint, so everything to the right of the line is a rating of 4 or 5. Hover or tap any block for the exact count.

Source: City of Boston Jackson Mann site survey, September 2026. Graphic made with assistance from Claude AI.